| NO |
DOSEN |
MATA KULIAH |
KLS |
JML |
UJIAN |
| KUIS / EVALUASI/ REMIDI |
HARI |
TANGGAL |
MULAI |
SELESAI |
RUANG |
| 1 |
Akhmad Marzuko Ir.,M.T. |
Pondasi I |
d |
40 |
Evaluasi LO 4 |
SELASA |
17-12-2019 |
08:40 |
10:20 |
TSP – II / 7 |
| 2 |
Muhammad Rifqi Abdurrozak ,S.T., M.Eng. |
Mekanika Tanah I (+ Pr) |
b |
24 |
Evaluasi LO 3, 4 |
SELASA |
17-12-2019 |
08:40 |
11:10 |
Lab. MEK. TAN. |
| 3 |
Sri Amini Yuni Astuti Dr. Ir.,M.T. |
Hidraulika II |
b |
39 |
Evaluasi LO 3, 4 |
SELASA |
17-12-2019 |
10:20 |
12:00 |
TSP III / 12 |
| 4 |
Tri Nugroho Sulistyantoro ,S.T., M.T. |
Analisis Investasi Proyek |
e |
35 |
Evaluasi LO 3, 4 |
SELASA |
17-12-2019 |
10:20 |
12:00 |
TSP – II / 4 |
| 5 |
Miftahul Fauziah ,S.T., M.T., Ph.D. |
Road Pavement Structures |
a |
12 |
Evaluasi LO 4 |
SELASA |
17-12-2019 |
13:00 |
14:40 |
TSP – I / 1 |
| 6 |
Wisnu Erlangga ,S.T., M.T. |
Teknik Kegempaan |
e |
40 |
Evaluasi LO 3, 4 |
SELASA |
17-12-2019 |
13:00 |
14:40 |
TSP III / 1 |
| 7 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
g |
24 |
Evaluasi LO 4 |
SELASA |
17-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 8 |
Tri Nugroho Sulistyantoro ,S.T., M.T. |
Manajemen Tenaga Kerja Konstruksi |
b |
40 |
Evaluasi LO 3, 4 |
RABU |
18-12-2019 |
07:00 |
08:40 |
TSP – II / 4 |
| 9 |
Meyliana Primitasari ,S.T., M.Eng. |
Pemetaan dan GIS (+ Pr) |
f |
25 |
Evaluasi LO 4, 5 |
RABU |
18-12-2019 |
08:40 |
11:10 |
I / 2 |
| 10 |
Mochammad Sigit Darmosudiharjo Ir.,M.T. |
Rekayasa Lalu Lintas (+ Pr) |
e |
25 |
Evaluasi LO 3, 4 |
RABU |
18-12-2019 |
13:00 |
15:30 |
Lab. JALAN RAYA |
| 11 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
a |
24 |
Evaluasi LO 4 |
RABU |
18-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 12 |
Muhammad Rifqi Abdurrozak ,S.T., M.Eng. |
Pondasi I |
c |
40 |
Evaluasi LO 3 |
KAMIS |
19-12-2019 |
07:00 |
08:40 |
TSP – II / 7 |
| 13 |
Harsoyo Dr. Ir.,M.Sc. |
Analisis Struktur Statis Tertentu |
b |
30 |
Evaluasi LO 3 |
KAMIS |
19-12-2019 |
08:40 |
10:20 |
TSP III / 2 |
| 14 |
Muhammad Rifqi Abdurrozak ,S.T., M.Eng. |
Pondasi I |
b |
45 |
Evaluasi LO 3 |
KAMIS |
19-12-2019 |
08:40 |
10:20 |
TSP – II / 4 |
| 15 |
Meyliana Primitasari ,S.T., M.Eng. |
Gambar Teknik |
g |
26 |
Evaluasi LO 3 |
KAMIS |
19-12-2019 |
09:30 |
12:00 |
Lab. KOMP_TS1 |
| 16 |
Teguh ,S.Ag., M.Pd.I. |
Pemikiran dan Peradaban Islam |
e |
17 |
Evaluasi LO 4 |
KAMIS |
19-12-2019 |
10:20 |
12:00 |
TSP – II / 4 |
| 17 |
Sri Amini Yuni Astuti Dr. Ir.,M.T. |
Hidraulika II |
c |
40 |
Evaluasi LO 3, 4 |
KAMIS |
19-12-2019 |
13:00 |
14:40 |
TSP III / 12 |
| 18 |
Miftahul Fauziah ,S.T., M.T., Ph.D. |
Struktur Perkerasan Jalan |
a |
42 |
Evaluasi LO 4 |
KAMIS |
19-12-2019 |
15:30 |
17:10 |
TSP III / 12 |
| 19 |
Wisnu Erlangga ,S.T., M.T. |
Pemetaan dan GIS (+ Pr) |
b |
25 |
Evaluasi LO 4, 5 |
JUM’AT |
20-12-2019 |
07:50 |
10:20 |
Lab. PEMETAAN |
| 20 |
Mochammad Sigit Darmosudiharjo Ir.,M.T. |
Road Geometry |
a |
12 |
Evaluasi LO 3, 4 |
JUM’AT |
20-12-2019 |
08:40 |
11:10 |
TSP – I / 1 |
| 21 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
f |
26 |
Evaluasi LO 4 |
JUM’AT |
20-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 22 |
Sri Aminatun ,S.T., M.T. |
Post Disaster Infrastructure Assesment |
a |
10 |
Evaluasi LO 3, 4 |
SENIN |
23-12-2019 |
08:40 |
10:20 |
TSP – I / 1 |
| 23 |
Muhammad Rifqi Abdurrozak ,S.T., M.Eng. |
Stabilisasi Tanah |
a |
15 |
Evaluasi LO 3, 4 |
SENIN |
23-12-2019 |
08:40 |
10:20 |
Lab. MEK. TAN. |
| 24 |
Akhmad Marzuko Ir.,M.T. |
Pondasi I |
d |
40 |
Remediasi LO 1,2 |
SELASA |
24-12-2019 |
08:40 |
10:20 |
TSP – II / 7 |
| 25 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
g |
24 |
Remediasi LO 1,2 |
SELASA |
24-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 26 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
a |
24 |
Remediasi LO 1,2 |
RABU |
25-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 27 |
Faisol A M Ir.,M.S. |
Manajemen Tenaga Kerja Konstruksi |
a |
32 |
Evaluasi LO 3, 4 |
SENIN |
26-12-2019 |
07:00 |
08:40 |
TSP – III / 13 |
| 28 |
Sri Aminatun ,S.T., M.T. |
Evaluasi Infrastruktur Pasca Bencana |
a |
31 |
Evaluasi LO 3, 4 |
KAMIS |
26-12-2019 |
08:40 |
10:20 |
TSP III / 1 |
| 29 |
Mochammad Sigit Darmosudiharjo Ir.,M.T. |
Road Geometry |
a |
12 |
Remed LO 1,2,3,4 |
JUM’AT |
27-12-2019 |
08:40 |
11:10 |
TSP – I / 1 |
| 30 |
Meyliana Primitasari ,S.T., M.Eng. |
Pemetaan dan GIS (+ Pr) |
h |
25 |
Evaluasi LO 4, 5 |
JUM’AT |
27-12-2019 |
13:00 |
15:30 |
I / 2 |
| 31 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
f |
26 |
Remediasi LO 1,2 |
JUM’AT |
27-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 32 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
g |
24 |
Remediasi LO 3, 4 |
SELASA |
31-12-2019 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 33 |
Akhmad Marzuko Ir.,M.T. |
Pondasi I |
d |
40 |
Remediasi LO 3, 4 |
SELASA |
31-12-2019 |
08:40 |
10:20 |
TSP – II / 7 |
| 34 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
a |
24 |
Remediasi LO 3, 4 |
RABU |
1-1-2020 |
13:00 |
15:30 |
Lab. MEK. TAN. |
| 35 |
Akhmad Marzuko Ir.,M.T. |
Mekanika Tanah I (+ Pr) |
f |
26 |
Remediasi LO 3, 4 |
JUM’AT |
3-1-2020 |
13:00 |
15:30 |
Lab. MEK. TAN. |